18 days to go, was only able to get one side of the roof replaced Sunday PM between rain bursts. The other side is ready to go under the plastic.
new side. rear curve frame waiting to be installed. then I can sheet it. then I can finally confirm the template for the cnc plasma cutter for the aluminum siding.
No comments:
Post a Comment